
Bridge
Xiliu Lake Bridge on the West Station Road Extension, Zhengzhou
A 230 m bridge on Zhengzhou’s West Station Road extension, including a Q355C fish-belly steel pedestrian bridge recorded at 701.48 tonnes.
PROJECTS
Explore delivered work across our project types. Each case study highlights the scope, challenges and solutions behind the project.
PROJECTS
Browse every published project. Click a project type above to see matching cases, or search by keyword.
21 case studies

Bridge
A 230 m bridge on Zhengzhou’s West Station Road extension, including a Q355C fish-belly steel pedestrian bridge recorded at 701.48 tonnes.

Bridge
A 50 m Q345qDNH steel box girder crossing the WaRi Railway on the S302 Tangyin upgrade, installed by incremental launching.

Bridge
HFCG’s documented ZXTJ-1 package covers fabrication and field erection of approximately 7,136 tonnes of steel box girders on the Zhengzhou–Xuchang Expressway.

Industrial Building Projects
Steel workshop framing at the Henan Topsun manufacturing base in Pingyu, with project photos of columns, roof members and purlins.

Long Span Structure
Steel fabrication and site installation records associated with the Yellow River National Museum in Huiji District, Zhengzhou.

Bridge
Steel box girder fabrication and field assembly for the Jinan Phoenix Yellow River Bridge South Extension, part of a major urban expressway corridor.

Custom Fabrication
Photo documentation of large welded steel trusses associated in the project files with the Shuanghui headquarters in Luohe, Henan.

Industrial Building Projects
A 9,951.6 m² Q355C steel cold storage building at Qianwei Yangchu’s Xinxiang base, with 28.7 m height and long columns joined on site.

Custom Fabrication
Photographic record of a glass-enclosed elevator and supporting steel frame installed inside an industrial building.