Bridge
Jinan Phoenix Yellow River Bridge South Extension Steel Box Girder
Steel box girder fabrication and field assembly for the Jinan Phoenix Yellow River Bridge South Extension, part of a major urban expressway corridor.
- Project Region
- Asia

Steel box girder fabrication and field assembly associated with the Jinan Phoenix Yellow River Bridge South Extension.
Project location: Phoenix Road corridor, Jinan, Shandong, China
Urban bridge and expressway context
The Phoenix Yellow River Bridge South Extension forms part of a major Jinan road project connecting the Yellow River crossing with southern districts. The project overview describes a 25.8 km corridor with elevated expressway sections and a six-lane mainline.
Steel box girder fabrication and assembly
Project photographs show steel components during workshop fabrication, assembly and field installation. Large box girders require precise geometry control and coordination between shop assembly, transport access, lifting operations and field connections.
Urban transport connection
The bridge works form part of the wider road network connecting routes between Jinan’s northern Yellow River crossing and southern districts.
Project photos



